Location: |
Denver, CO |
Scope of Work: |
Asbestos Abatement, Hydro Blasting |
Contract Value: |
$2.2 million |
Date: |
Jan 2015 – April 2015 |
Client: |
White Construction Group |
ESA was contracted to perform the interior abatement, contaminated soil remediation, and interior demolition on the former Stanley Aviation Manufacturing Plant under anEPA grant. This project included abatement under containment of all tile, mastic, pipe, pipe fittings, asbestos drywall, and fire brick. The demolition scope included saw cutting all new window and door openings as well as demolition of all the floor around the existing openings to allow for installation of oversized archways and porticos. All exterior block filler was abated and demolished under containment. 40,000 square feet of asbestos asphalt was removed from the existing parking lot and transported to the appropriate landfill. ESA also removed over 10,000 yards of asbestos contaminated soil during the site work phase of the project. Finally, ESA demolished all the existing small buildings on the site.