Location: |
Des Moines, IA |
Scope of Work: |
Interior |
Contract Value: |
$122,800.00 |
Date: |
June 20, 2016 – July 15, 2016 |
Client: |
Des Moines Community School District |
Central Campus is Centralized Des Moines School. The project was to be a major structural remodel which included the removals of: Concrete Mezzanine approximately 20’ x 40’ , CMU Walls, Ductwork, Piping and the Locker Room Area’s.