Location:

Des Moines, IA

Scope of Work:

Interior

Contract Value:

$122,800.00

Date:

June 20, 2016 – July 15, 2016

Client:

Des Moines Community School District

Central Campus is Centralized Des Moines School. The project was to be a major structural remodel which included the removals of: Concrete Mezzanine approximately 20’ x 40’ , CMU Walls, Ductwork, Piping and the Locker Room Area’s.