Location: |
Lakewood, Colorado |
Scope of Work: |
Asbestos Abatement, Demolition, Soil Remediation |
Contract Value: |
$1.2 Million |
Date: |
September 2014 – March 2015 |
Client: |
Westlink at Oak Street/Brinkmann Constructors |
ESA contained this 160,000-sf structure and performed the complete asbestos abatement of all CMU block on the structure. ESA demolished the block within containment and removed the ACM through a direct-waste loadout. The steel structure and roof remained in place until after all the block was removed. Once the containment was cleared, ESA removed it and performed a full structural demolition of the building and all concrete foundations. ESA recycled all the steel and concrete as part of the demolition process. In 2016, ESA won the National Award of Environmental Excellence from the National Demolition Association for this project.