ESA, Inc. was founded in 1982 as an asbestos abatement firm. Today, with over 6,000 projects under our belt, ESA has grown into a full-service environmental and demolition firm. While we have bolstered our offerings with other environmental services, and an ability to perform demolition, we are still fundamentally an abatement contractor. We are able to deliver results in most states across the U.S. while still delivering the personal service ESA is known for.
Notable Projects | ||
|
Union Pacific Railroad
Multiple Sites Client: Union Pacific Railroad Contract Value: over $6 Million Date: 2005 - present The project included; removal of asbestos and hazardous materials along with the demolition of old railroad depots and properties ranging from Illinois to Idaho. Projects range from $500,000 to $700,000. Some of our most recent projects were in Ogden Utah, Kimball Nebraska and Mountain Home, Idaho. Over the course of our relationship with the Union Pacific Railroad we have completed over $6,000,000 worth of work including multiple projects in 2009. | ||
|
US Army Hospitals
Multiple Sites Client: U.S. Federal Government Contract Value: over $4.5 Million Date: Ongoing ESA has worked with the U.S. Federal Government for over 25 years. In this series of projects, ESA removes asbestos & hazardous materials, and also performs interior demolition in U.S. Army hospitals. This work continued in 2009 with projects at Fort Carson in Colorado Springs. The U.S. Army has preferred our ability to deliver consistent results at facilities throughout the United States, while still meeting time schedules. In addition, hospital work requires special attention. All of this work, in particular, was performed under infectious controls and while hospitals were occupied. ESA is proud of its work in facilities ranging from Arizona to Georgia, including Ft. Gordon, Ft. Leonard Wood, Ft. Campbell, Ft. Riley, Ft. Benning, Ft. Huachuca, and Ft. Carson.
| ||
|
The Veteran's Administration - VA Medical Center
Aurora, Colorado Client: GSA JV LLC. Contract Value: $1.2 Million Date: September - December 2009 In this teaming arrangement ESA, Inc. partnered with Garry Struthers and Associates to perform all of the management, asbestos abatement & demolition on these structures located on the Veteran’s Administration property. This project is an example of ESA’s ability to offer turkey services to perform our clients’ abatement and demolition needs. We utilized our fleet of excavators to self perform all of the demolition. Prior to demolition, asbestos abatement included floor tile, vinyl flooring, as well as vermiculite insulation removal on one large structure (40,000 sf) and two smaller buildings. Additionally, ESA performed onsite milling of the asphalt from the parking lot. | ||
|
Former KD Station Packing Plant Sioux City, Iowa Client: DORE & Associates Contract Value: $535, 000 Date: May - August 2009
KD Station was once the largest packing plant in the United States. ESA worked as a subcontractor to Dore & Associates, the demolition contractor. ESA performed all of the asbestos abatement in this massive structure. | ||
|
The Denver Federal Center
Saint Anthony’s Hospital, Lakewood, Colorado Client: Walsh Environmental Scientists/RE Monks Construction Contract Value: $1.2 Million Date: January - March 2009 ESA was ideally suited for this asbestos contaminated soils project consisting of a 121,000 cubic yard excavation. The project also required the building of a parking lot, and all final site work for what is now the Saint Anthony’s Hospital in Lakewood, Colorado. Walsh Environmental provided all of the project oversight. ESA worked closely with RE Monks Construction, who handled all of the project management, site work, trucking and parking lot construction. ESA lined, loaded, wrapped and handled all of the asbestos contaminated soil, in addition to select site demolition. ESA’s well-trained crew of Hazwoper & Asbestos certified employees were able to maintain an aggressive schedule despite tough winter conditions and difficult access to the site. | ||
|
The University of Colorado Auraria Science Center Renovation Denver, Colorado Client: JACOBS Contract Value: $1.9 Million Date: March - April 2008 This project showcased ESA's capacity to safely excavate, remove and transport nearly 40,000 cubic yards of asbestos contaminated soil in less than six weeks, while working in the heart of downtown Denver. Working with Haselden Construction and JACOBS, ESA designed a plan to quickly and safely remove contaminated soils, as well as a buried tank and other hazardous materials. Since the remediation was not part of the original construction schedule, ESA designed a plan that would minimize construction delays. Despite downtown traffic, ESA was able to finish the job in a matter of weeks. | ||
| South Dakota Post Office Facility Sioux Falls, South Dakota Client: U.S. Postal Service Contract Value: $1.9 Million Date: August 2007
This project included the removal of all asbestos and hazardous materials from the Main Post Office building in Sioux Falls, South Dakota. The project required the removal of all ceilings walls, fireproofing, flooring and pipe insulation throughout the building. | ||
| ||
116 Gateway Drive . P.O. Box 1370 . North Sioux City, SD 57049
605.232.4554