![]() |
ESA, Inc. was founded in 1982 as an asbestos abatement firm. With over 5,000 projects under our belt, ESA has grown into a full-service environmental and demolition firm. While we have bolstered our offerings with other environmental services, and an ability to perform demolition, we are still fundamentally an abatement contractor. Our clients prefer our ability to deliver timely solutions while always remaining cost-effective. We are also able to deliver results in most states across the country while still delivering the personal service ESA is known for. We look forward to delivering the same results for you. |
|||||
Removal of asbestos and hazardous materials along with the demolition of old railroad depots and properties ranging from Illinois to Idaho. Projects range from $50,000.00 to $700,000.00. Some of our most recent projects were in Ogden Utah, Kimball Nebraska and Mountain Home, Idaho - all completed in 2006. Over the course of our relationship with the Union Pacific Railroad we have completed over $6,000,000.00 worth of work. |
|||||
ESA removed over 100,000 sq ft spray-on fireproofing from four story commercial building. Demolition of all ceilings, electrical and mechanical systems was also included. On this project the facility was occupied for the entire clean-up and demolition. In order to accommodate the tenant, work was performed in phases. |
|||||
ESA has worked with the U.S. Federal Government for over 25 years. In this series of projects, ESA removed asbestos & hazardous materials, and also performed interior demolition in U.S. Army hospitals. The U.S. Army has preferred our ability to deliver consistent results at facilities throughout the United States, while still meeting time schedules. In addition, hospital work requires special attention. All of this work, in particular, was performed under infectious controls and while hospitals were occupied. ESA is proud of its work in facilities ranging from Arizona to Georgia, including Ft. Gordon, Ft. Leonard Wood, Ft. Campbell, Ft. Riley, Ft. Benning, Ft. Huachuca, Ft. Carson. |
|||||
One of the major strengths of ESA, Inc. is our ability to administer both the abatement and demolition scopes of work on a project. Hangar 10 is a good example of this. ESA, Inc. had both abatement crews and demolition crews working in conjunction to remove this hangar from the old Stapleton International Airport site. The hangar was built large enough to encompass a jumbo jet. ESA, Inc. also demolished the office building that housed the administrative functions for the hangar. The office space needed to be abated before demolition could occur. Once the hangar was cleaned out of all interior structures ESA, Inc. worked with Chicago Explosives to implode the hangar structure. |
|||||
This project includes the removal of all asbestos and hazardous materials from the Main Post Office building in Sioux Falls, South Dakota. Includes removal of all ceilings walls, fireproofing, flooring and pipe insulation throughout the building. |
|||||
ESA, Inc. removed 42,000 sq ft of boiler, vessel, tank and breeching insulation along with 18,000 linear feet of pipe insulation removal from this abandoned, 10-story power plant. |
|||||
|
|||||